MBTA Ashmont - Mattapan Line: Traction Volume One

The Ashmont-Mattapan High Speed Line operates 2.6 miles of track from Ashmont Station to Mattapan Station just south of Boston. We capture this neat little commuter operation in the state of Massachusetts. They operate with all PCC trolley cars! This operation offers a vital link to commuters to get to Boston easily from the suburbs of Boston! It is a landlocked line that connects with the Red Line at Ashmont Station! Filmed in 2022 & 2023 at 7 of the 8 stations.

Release date : 2023-01-01

Production country :
United States of America

Production company :
Blackstone River Productions

Durasi : 35 Min.

Popularity : 2

0.00

Total Vote : 0

Advantages of movie

Almost all films carry messages about love, struggle, justice, hope, or humanity that can inspire the audience.

movie Shortcomings

There are films that are too slow at the beginning and too fast at the end — or vice versa — making the audience easily bored or confused.