Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Release date : 1971-01-01
Production country :
Canada
Production company :
ONF | NFB
Durasi : 22 Min.
Popularity : 0
0.00
Related Moviesâ¨
Movies

Wolsong: Vanishing Town
2019
1
Movies

The Atom: A Love Affair
2019
6.80
Movies

Sista varningen!
1980
1
Movies

The Battle of Chernobyl
2007
7.50
Movies

We Are the Guinea Pigs
1980
6.00
Movies

Atomic: Living in Dread and Promise
2015
6.60
Movies

Inside Chernobyl with Ben Fogle
2021
7.60